Skip to content
MOCKBAMODULARMOCKBA MODULAR
Design study

Academy pool and recovery suite

A series of options for a single-storey modular pool and recovery building at a training ground, linked to the existing gym and main building, comparing pool sizes, plunge pools and recovery space within one fixed footprint.

Professional football club, identity withheld. Concept-stage study, not presented as a completed project.

Concept ground-floor plan of the pool building: swimming pool, recovery room, changing, wet room, WCs, plant room and links to the existing gym and main building
Scheme 1: pool, recovery room, changing and plant

Presentation drawing based on the design study. Not for construction.

What the study explored

  • Four pool set-out options within one building envelope
  • Recovery room, changing, wet room and WC adjacencies
  • Plant-room position and external plant access
  • Covered links into the existing gym and main building
  • Full-height glazing to the pool hall with a solid rear elevation
Concept elevation of the pool building showing three glazed openings, a plant-room louvre and the link to the existing building
Concept visualisation, not a photograph. Concept elevation: glazed pool-hall side

Have a project in mind?

Send the intended use, the site and the programme, with any drawings or photographs, and we will come back to you.