Design study

Phased sports club facility

A single-storey clubhouse of eight modular bays developed in three phases: a club room with kitchen, cold room and store; a support block with officials' changing, first aid and physio, plant and public WCs; and four team changing rooms with drying areas, showers and WCs, all linked by a central corridor and a shared entrance lobby.

Sports club, identity withheld. Concept-stage study, not presented as a completed project.

General arrangement

Eight bays, three phases

Phased sports club facility, presentation planPresentation plan of a single-storey sports club facility in three phases: a club room with kitchen, cold store and store; officials' changing, first aid and physio, plant and public WCs; and four team changing rooms with drying areas, showers and WCs, linked by a central corridor and an entrance lobby.
Phase 3 team changing (left), phase 2 support (centre), phase 1 club room (right)

Presentation drawing based on the design study. Not for construction.

What the study explored

  • Three-phase delivery on one modular grid
  • 187 m² club room with kitchen, cold room and store
  • Home, away and officials' changing with drying areas and showers
  • First aid and physio room beside the changing accommodation
  • Accessible WC with baby change, male and female WCs
Concept visualisation of a long single-storey timber-clad sports club building with a dark monopitch roof and full-height glazing to the club room
Concept visualisation, not a photograph. Concept visualisation: club room elevation